Submitted by JOSIANE SANTOS DE OLIVEIRA (josianeso) on 2018-08-01T14:03:04Z
No. of bitstreams: 1
Daniel Antoniazzi Denicol_.pdf: 1064153 bytes, checksum: f6cc5f31a6e2026f442addeda2c63541 (MD5) / Made available in DSpace on 2018-08-01T14:03:04Z (GMT). No. of bitstreams: 1
Daniel Antoniazzi Denicol_.pdf: 1064153 bytes, checksum: f6cc5f31a6e2026f442addeda2c63541 (MD5)
Previous issue date: 2018-04-30 / Nenhuma / Em face da demanda de desenvolvimento sustentável, o processo de projeto de arquitetura tem sofrido transformações bastante abrangentes. Baseados em um modelo de tomada de decisão hierárquico e sequencial, os habituais métodos de trabalho desenvolvidos pela indústria da construção civil têm se mostrado inadequados. Emerge, então, a necessidade de um projeto integrado que, em princípio, reúne as condições para o enfrentamento da complexidade do contexto no qual se projeta/produz a arquitetura contemporânea, assim como aquela complexidade própria do processo projetual. Ainda assim, a julgar pela complexidade e sofisticação do processo de projeto em arquitetura, não há como garantir, em se tratando de processo criativo, que um processo eficiente equivale a um projeto melhor. Dessa forma, este trabalho tem por objetivo, através de um questionário destinado à arquitetos e urbanistas selecionados em função da relevância do trabalho desenvolvido na área de projeto sustentável, estabelecer a relação entre projeto integrado e o processo projetual desenvolvido por arquitetos brasileiros, atualmente, nas circunstâncias que cercam e determinam os trabalhos em arquitetura e manifestam a imprescindibilidade do aprimoramento dos procedimentos adotados. Através da análise dos dados coletados foi possível observar que, conforme a percepção dos arquitetos, o Trabalho Multidisciplinar Integrado, a Avaliação do Desempenho e a Gestão do Processo foram os aspectos que mais exerceram influência sobre o processo projetual da obra de arquitetura. / Facing the demand for sustainable development, the architectural design process has suffered extensive transformations. Based on a hierarchical and sequential decision-making model, the usual working methods developed by the construction industry has proved to be inadequate. Emerges, then, the need for an integrated design that, in principle, gathers the conditions for coping with the complexity of the context in which produces contemporary architecture, as well as that inherent complexity of the design process. Still, judging from the complexity and sophistication of the architectural design process, there’s no way to ensure, in case of creative process, that an efficient process is equivalent to a better project. In this way, this work has the objective, through a questionnaire destined to the architects selected in function to the relevance of the work developed in the sustainable project area, to establish the relation between integrated project and the design process in architecture. Through the analysis of the collected data, it was possible to observe that, according to the architects' perception, the multidisciplinary and collaborative work, the performance evaluation and the process management were the aspects that most influenced the design process.
Identifer | oai:union.ndltd.org:IBICT/oai:www.repositorio.jesuita.org.br:UNISINOS/7125 |
Date | 30 April 2018 |
Creators | Denicol, Daniel Antoniazzi |
Contributors | http://lattes.cnpq.br/1555729873996754, Oliveira, Maria Fernanda de |
Publisher | Universidade do Vale do Rio dos Sinos, Programa de Pós-Graduação em Arquitetura e Urbanismo, Unisinos, Brasil, Escola Politécnica |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UNISINOS, instname:Universidade do Vale do Rio dos Sinos, instacron:UNISINOS |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0022 seconds