El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. / This study focuses on problems of inadequate production capacity management. The factors that generate this scenario are related to the incorrect distribution of work areas, the absence of standardization of the production process and unorganized workstations in the production line. The application of 5S’s tool, Value Stream Mapping (VSM) and a proposal for plant design are presented to solve the problem. After the application of the design solution, it was identified that 1 h and 23 min can be saved in transfer times, which can be invested in the manufacture of more products, improving the use of the plant’s capacity.
Identifer | oai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/656032 |
Date | 01 January 2021 |
Creators | Arroyo-Andrade, Flavio, Coral-Rodriguez, Pebelyh, Cabel-Pozo, Jhonatan, Alvarez, Jose |
Publisher | Springer |
Source Sets | Universidad Peruana de Ciencias Aplicadas (UPC) |
Language | English |
Detected Language | English |
Type | info:eu-repo/semantics/article |
Format | application/html |
Source | Universidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC, Advances in Intelligent Systems and Computing, 1253 AISC, 573, 578 |
Rights | info:eu-repo/semantics/embargoedAccess |
Relation | https://link.springer.com/chapter/10.1007/978-3-030-55307-4_87 |
Page generated in 0.002 seconds