Return to search

Assessment of the national DSM potential in mine underground services / M. den Boef

ESKOM is moving towards a price structure for electricity which reflects, as far as
possible, the real cost of generation. It is called real time pricing (RTP). ESKOM
developed this cost structure to coax customers to use more electricity in off-peak
periods (low cost of generation) and less electricity in peak periods (high cost of
generation). However, many industries do not effectively use these price offerings
from ESKOM to the detriment of themselves and ESKOM.
In previous research improvements to this situation for the South African mining
industry were investigated. ESKOM funded research to find the potential for load
shifting on mines using RTP. The RTP investigation focused on the supply side
management (SSM) in the mining context of underground services on gold and
platinum mines. Elements investigated included the ventilation, cooling and pumping
(VCP) systems. (Except for pumps, these plants are generally installed
aboveground.)
Previous research showed a national RTP and SSM potential to shift 500 MW of
electrical load for a period of 5 hours. Through the previous research it became clear that the mines were previously able to
react partially to the price signals. However, it was proved by the research that the
full load shift potential can only be realised through the use of integrated dynamic
simulation and optimisation.
An even higher potential exists for load shift and electricity efficiency through demand
side management (DSM) on the underground services. Therefore, if underground
DSM strategies are combined with SSM strategies, a further and much bigger
potential can be exploited to the benefit of ESKOM and the mines. Due to these
factors this study was undertaken.
Three case study mines were identified for this study. They are Kopanang and
Target, both gold mines, and Amandelbult, a platinum mine. The DSM potential on
each of these mines was calculated using simulation, calibration, verification and
optimisation.
These results were presented to mine management to negotiate the implementation
of the proposed strategies on one of the mines. Kopanang's management agreed to
the implementation of these strategies for a trial period of 3 months after which the
success would be evaluated.
The results of the implementation, together with the case study results, were used to
calculate the national DSM potential in the mining sector through extrapolation. The
DSM potential amounts to 650 MW of load per day as well as 5% on electricity
consumption. This amounts to a potential saving of R72.1 million per year using
current tariffs. This means that ESKOM can save about R5000 million on the
building of a new power station to supply the equivalent load to the DSM potential.
Now that the national impact has been calculated and discussed, all these findings
must be used to motivate the implementation of these strategies throughout the
mining sector. A similar project can be undertaken to look at possible DSM
strategies in the industrial sector.
This might prove to be more difficult as the electricity intensive systems are mostly all
linked to the final production. In the mind of management this out-weighs the
possible cost savings that can be achieved.
ESKOM and the NER will have to rethink their strategy. Through DSM and load
shifting actions alone the pending electricity crisis will not be averted. The current tariff structures should be amended to not only reflect the true cost of electricity but
also provide incentive for DSM and load shifting.
Another problem that must be addressed to achieve the DSM targets set for 2007 is
the time that it takes to complete the study as well as the implementation time.
Software can easily be created to help in the speeding up of the case study itself, as
the process and steps followed, as well as models used, are very generic (at least in the gold and platinum mining sector). / Thesis (Ph.D. (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2004.

Identiferoai:union.ndltd.org:NWUBOLOKA1/oai:dspace.nwu.ac.za:10394/111
Date January 2003
CreatorsDen Boef, Martinus
PublisherNorth-West University
Source SetsNorth-West University
Detected LanguageEnglish
TypeThesis

Page generated in 0.0026 seconds