Return to search

Aplicação da Teoria das Restrições (TDR) na gestão da cadeia produtiva de uma indústria farmacêutica / the Theory of Constraints Application ( TDR) in the management of the production chain of the pharmaceutical industry

Made available in DSpace on 2016-06-21T13:45:00Z (GMT). No. of bitstreams: 2
7.pdf: 1105115 bytes, checksum: fe5180e8f2e04c10f744f723b58c7b95 (MD5)
license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5)
Previous issue date: 2012 / Made available in DSpace on 2016-07-05T22:38:03Z (GMT). No. of bitstreams: 3
7.pdf.txt: 142101 bytes, checksum: 1874a7bad804f5a04371681db5d8c8a1 (MD5)
license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5)
7.pdf: 1105115 bytes, checksum: fe5180e8f2e04c10f744f723b58c7b95 (MD5)
Previous issue date: 2012 / Fundação Oswaldo Cruz. Instituto de Tecnologia em Fármacos/Farmanguinhos. Rio de Janeiro, RJ, Brasil. / A busca por técnicas de gestão que possibilitem um melhor aproveitamento da capacidade instalada de plantas produtivas é o desafio constante de todos os gestores. A utilização da Teoria das Restrições (TDR) como ferramenta de gestão no ambiente produtivo deste estudo possibilitou evidenciar o uso racional dos equipamentos do parque fabril a partir da identificação dos gargalos dos processos produtivos dos produtos mapeados. O dimensionamento dos pulmões de proteção da restrição e de espaço demonstrou como é possível manter o fluxo constante de produção sem a necessidade de elevados estoques em processo entre os centros de trabalho que compõem os sistemas produtivos. A análise da capacidade global do sistema pode evidenciar os centros de trabalho com restrição de capacidade frente à demanda posta. / The quest for management techniques that enable a better utilization of productive capacity of plants is the constant challenge for all managers. Using the Theory of Constraints (TOC) as a management tool in the production environment of this study highlight the possible rational use of the equipment of the industrial park from the identification of “bottlenecks” of the production processes of products mapped. The sizing of the lungs to protect the space restriction and demonstrated
how you can keep a steady flow of production without the need for high in-process inventories between the work centers that compose the productive systems. The analysis of the overall capacity of the system can highlight the work centers capacity constraint put forward the demand.

Identiferoai:union.ndltd.org:IBICT/oai:www.arca.fiocruz.br:icict/14549
Date January 2012
CreatorsLagreca, Fabio Rezende
ContributorsMedina, Fernando, Rocha, Helvécio Vinícius Antunes, Viçosa, Alessandra Lifsitch, Cardoso, Vinicius Carvalho, Costa, Jorge Carlos Santos da
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da FIOCRUZ, instname:Fundação Oswaldo Cruz, instacron:FIOCRUZ
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.002 seconds