El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. / The problem identified is the poor management and control of production, which includes direct consequences with regard to quality, planning of operations and work method; generating mainly penalties for non-fulfillment of orders, increased operating costs and lost opportunity cost that negatively affect the efficiency of the production process of concrete posts and accessories in a SME company. The implementation of an improvement model is proposed applying the Lean Manufacturing philosophy; whose application is focused on improving 3 main waste in the production system: defects, inventory and waiting time. The proposals of the study generated a reduction in the percentage of defects in the company by 6.46%, 9.50% in the case of penalties for non-compliance with orders, 34.67% in the cycle time and a 21% increase in the OEE of the machines.
Identifer | oai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/656028 |
Date | 01 January 2021 |
Creators | Ortiz-Bailon, Mariella, Vera-Espino, Ruben, Quiroz-Flores, Juan, Alvarez, Jose |
Publisher | Springer |
Source Sets | Universidad Peruana de Ciencias Aplicadas (UPC) |
Language | English |
Detected Language | English |
Type | info:eu-repo/semantics/article |
Format | application/html |
Source | Universidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC, Advances in Intelligent Systems and Computing, 1253 AISC, 560, 565 |
Rights | info:eu-repo/semantics/embargoedAccess |
Relation | https://link.springer.com/chapter/10.1007/978-3-030-55307-4_85 |
Page generated in 0.0019 seconds