Return to search

Modelo de decisão multicritério em contratos de manutenção em meio ao conceito de delay time

Submitted by Haroudo Xavier Filho (haroudo.xavierfo@ufpe.br) on 2016-06-03T18:19:50Z
No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
DarlanMarques - Dissertação - 2015.pdf: 2076557 bytes, checksum: 43a8011bba20e4be682b2212d8ab2aab (MD5) / Made available in DSpace on 2016-06-03T18:19:50Z (GMT). No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
DarlanMarques - Dissertação - 2015.pdf: 2076557 bytes, checksum: 43a8011bba20e4be682b2212d8ab2aab (MD5)
Previous issue date: 2015-10-20 / CNPq / Ter um processo produtivo íntegro que garanta a qualidade da produção e reflita em uma redução dos custos e aumento na eficácia de uma empresa, atendendo os requisitos demandados pelos stakeholders é o desejo de grande parte das organizações. Um árduo processo de gestão em relação aos elevados custos das empresas, estão intrinsecamente relacionados à manutenção, principalmente, em políticas que levem a maximização da disponibilidade do sistema e a minimização dos custos. Quando denota-se na contratação de fornecedores para realizar serviços da manutenção em uma empresa, não foge à regra, sabendo-se que cada candidato em fornecer o serviço, apresentam variações entre os seus respectivos critérios, que muitas vezes são conflitantes entre si e um modelo que dá suporte a decisão pode auxiliar o decisor a quem escolher, maximizando as suas preferências. Com este intuito, criou-se este trabalho, visto que se desenvolve um modelo de decisão multicritério utilizando a abordagem de MAUT para selecionar fornecedores de serviço em manutenção, que apresentem variações de parâmetros em meio a concepção Delay Time. Esta proposta de construção do modelo deu suporte a uma aplicação numérica na simulação de valores que chegam a utilidade individual da indisponibilidade e do custo, por fim a utilidade agregada entre ambos, que é justamente o que deseja-se saber, pois este valor da utilidade agregada permite realizar um ranking para selecionar o melhor fornecedor. Assim, criou-se três fornecedores fictícios, pela indisponibilidade de dados reais para verificar o comportamento do modelo, atribuindo-se valores ao custos (custo de falha , custo de manutenção preventiva e custo de inspeção ) e também para os tempos (tempo de realizar uma ação preventiva , tempo decorrente da uma falha e o tempo em realizar uma inspeção ). Os resultados revelaram que o primeiro fornecedor apresentou uma maior utilidade global 1((),()) de (0,89), portanto ficando na primeira colocação, seguido pelo Fornecedor 3 com 3((),()) de (0,886) e por último o Fornecedor 2 com 2((),()) de (0,856), sabendo-se que todos os três apresentam uma política que adota tempo entre inspeções (T). / Having a healthy productive process that guarantees the quality of production and reflected in a reduction in costs and increase in the effectiveness of a company, meeting the requirements demanded by stakeholders is the desire of most organizations for profit. An arduous process management in relation to the high costs of the companies are closely related to the maintenance, especially in policies that maximize system availability and minimizing costs. When is denoted in hiring vendors to perform maintenance services company, is no exception, given that each candidate to provide the service, demonstrates variations between their respective criteria, which are often conflict with each other and model that supports the decision can help the decision maker who choose to maximize your preferences. To this end, it was created this work, in that is developed a multi-criteria decision model using MAUT approach to select service providers for maintenance, which give parameter variations amid a conception Delay Time. This building proposal model has supported a numerical application in simulation values that reach individual utility of down time and cost, finally aggregate utility between them, which is precisely what you want to know, because this value utility aggregate enables a ranking to select the best supplier. Thus, it created three fictitious suppliers, the unavailability of real data to verify the model behavior, assigning values to costs (failure cost , cost of preventive maintenance and inspection cost ) and also for the times (time to perform preventive action , time resulting from a failure and the time to hold a inspection ). The results revealed that the first supplier is greater overall utility 1((),()) of (0.89), therefore being in the first place, followed by Supplier 3 with 3((),()) of (0.886) and finally with 2 Supplier 2((),()) of (0.856), it is known that all three have a policy that takes time between inspections (T).

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufpe.br:123456789/17034
Date20 October 2015
CreatorsSILVA, Darlan Marques da
ContributorsCAVALCANTE, Cristiano Alexandre Virgínio
PublisherUniversidade Federal de Pernambuco, Programa de Pos Graduacao em Engenharia de Producao, UFPE, Brasil
Source SetsIBICT Brazilian ETDs
LanguageBreton
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFPE, instname:Universidade Federal de Pernambuco, instacron:UFPE
RightsAttribution-NonCommercial-NoDerivs 3.0 Brazil, http://creativecommons.org/licenses/by-nc-nd/3.0/br/, info:eu-repo/semantics/openAccess

Page generated in 0.0015 seconds