In this report a product development process is constructed and used to redesign an omnidirectional treadmill, the Omnideck. The current design of the Omnideck platform is designed without regard for assembly. Using modularity and design for assembly theories, incorporated with the product development process, the Omnideck platforms design is improved in respect to assembly time. The original design required 175 labour hours to install. The result is an improved design which requires ten and a half hours to install at a customer. This is achieved by redesigning the Omnideck into individual modules which allow for a faster installation.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:lnu-52888 |
Date | January 2016 |
Creators | Brinks, Hanne, Bruins, Mathijs |
Publisher | Linnéuniversitetet, Institutionen för maskinteknik (MT), Linnéuniversitetet, Institutionen för maskinteknik (MT), Windesheim university of applied sciences (Netherlands), Windesheim university of applied sciences (Netherlands) |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0024 seconds