Malingsbo Estate is a 18th century wooden building located in the small village of Malingsbo. Through the years, the estate has had a wide variation of usages. Today, almost 70 years since the last major renovation it is being utilized 6 weeks per year. The following report, which has been made possible with the cooperation with the National Property Board (Statens Fastighetsverk) seeks to answer the following four questions. 1: What is the current climate inside the building 2: What are the resident’s views on the climate and the status of the building. 3: suggestions on how to, with the current building increase the period in which the inside climate is suitable for living. 4: Suggestions for lowering the energy usage for the building. These four points seeks to be answered with the following method: reports from Statens Fastighetsverk, surveys, field excursions and simulations in VIP-Energy. The result of this report which should be especially considered is the following: At present time with no heating in the building, residents feel the climate during July to be acceptable to good, while during October most thinks it is to cold. For increasing the duration where the building meets a temperature of 20 degrees Celsius to 24 weeks’ installations of a 12500 W heating system is needed. For lowering the energy consumption without making large changes to the building two options should be specially considered: Insulation in the foundation with 50 mm insulation, and installation of window shutters during week 45 to 10. A larger installation suitable is solar panels for heating.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-326351 |
Date | January 2017 |
Creators | Nordström, Henrik |
Publisher | Uppsala universitet, Byggteknik |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0018 seconds