This is a study about how to improve the building envelope from a group of housing belonging to The Million Programme, a housing programme implanted in the Sweden around 70’s. Massive buildings made of concrete, which were constructed really fast because of the pressing time Schedule and were not developed as they should. This renovation study is explained with examples and drawings and it basically shows how to add thermal insulation on the most conflictive points of the building envelope. It is done in order to improve climatic conditions inside housing, trying to make thermal bridges disappear and reducing energy loss.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-44547 |
Date | January 2011 |
Creators | Tudó, Marc |
Publisher | KTH, Byggvetenskap |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | Examensarbete Byggnadsteknik ; 419 |
Page generated in 0.0021 seconds