This report will try to evaluate the use of rented concrete casting moulds, which are used to build walls and system of joists. The evaluation is only examining the economical aspects. The cost of using concrete casting moulds is a big part of the total production expenses. Therefore it is important that the calculated price not exceeds the final costs of the casting moulds. The calculated price is the price used in the process of making an offer. The evaluation consists of a comparison of the calculated price and the final costs for three building projects. It also evaluates the exploitation of the concrete casting moulds for each project. The report is made by Sven Gynne and Anders Alexandersson at School of Engineering, Jonkoping University, in cooperation with PEAB Jonkoping. The evaluation is strictly based on the calculated price and final cost of rented concrete casting moulds, only the moulds themselves, not the labour costs. Educational visits have been made to the three projects gathering facts. The conclusions we have drawn are that the difference between the calculated price and the final costs are considerable, especially one project have a greater difference than the others. The reasons for that are among other things tight building ground and a complicated building construction.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hj-1029 |
Date | January 2007 |
Creators | Alexandersson, Anders, Gynne, Sven |
Publisher | Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0019 seconds