University of Alberta
Yield Improvement and Waste Reduction in Insulating Glass Unit Manufacturing: A Multi-Level Value Stream Mapping and Multi-Criteria Decision Framework
Abstract
dc:description.abstractThe manufacturing of insulating glass units (IGUs) can be susceptible to material waste, scrap and rework because defects created during upstream manufacturing processes are often identified only at downstream inspection or after delivery. Therefore, the location of the detection recorded may not be the operation where the defect or waste mechanism was introduced. This thesis introduces and illustrates an integrated Lean decision framework that includes a reproducible operational baseline, multi-level value stream mapping (VSM), targeted Lean intervention design, multi-criteria decision analysis (MCDA), and future-state implementation planning to improve yield and reduce waste in IGU manufacturing. The framework is illustrated with a case study of a confidential Western Canadian IGU manufacturing facility that includes operational data from April 1 to July 31, 2025. The three waste channels are examined, including cutting waste (Type 1), post-assembly scrap (Type 2) and customer returns (Type 3). A total of 36,104 parent glass sheets were processed during the study period with an overall area-based yield of 77.6%. Low volume stock-keeping units (SKUs) comprised 7.40% of processed sheets but 27.60% of the Type 1 waste cost. Confidential facility records, direct observations and interviews with managers, supervisors and shop-floor personnel were used to develop current-state macro-, meso-, and micro-level VSMs. The maps and related origin versus detection diagnosis were reviewed with facility personnel iteratively to ensure that the maps accurately reflect actual operations. This diagnosis helps to identify where waste or defects are being documented and the operations where the underlying mechanisms might have been introduced. The results are converted to 13 specific Lean interventions. They are evaluated for their operational and financial potential based on cutting records, a sample of rejected IGUs, enterprise resource planning cost records and facility-supported process evidence. A design of experiments protocol is also designed for further empirical validation. The interventions are then ranked based on a weighted-sum MCDA under balanced, cost-focused, and impact-focused scenarios, filtered for operational guardrails (no throughput reduction and no increase in lead time), and added to future-state multi-level VSMs and a phased implementation roadmap. The thesis presents a repeatable and verifiable operational diagnosis to intervention prioritization process for fragile manufacturing systems with delayed defect detection. All savings reported are analytical projections and not actual results after implementation. The framework can be adapted to other manufacturing contexts by adjusting the data inputs, assumptions, and decision criteria.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Master's
- Discipline thesis:degree_discipline
- Construction Engineering and Management
- Grantor
- University of Alberta
- Year dc:date.issued
- 2026
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Itani, Mohamad
- Advisors dc:contributor.advisor
-
- Al-Hussein, Mohamed (Civil and Environmental Engineering)
- Abourizk, Simaan (Civil and Environmental Engineering)
Subjects
dc:subject × 6Rights
dc:rights- Statement dc:rights
-
- This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- DOI dc:identifier.doi
- https://doi.org/10.7939/85870