University of Birmingham
Transmission expansion planning and unit commitment with large-scale integration of wind power
Abstract
dc:description.abstractThe large-scale integration of wind generation into the power system brings great challenges to transmission expansion planning (TEP) and unit commitment (UC). The intermittence nature of wind generation needs to be fully considered in these two problems, which stimulates the research of this thesis. The selection of candidate lines is the prerequisite for the TEP problem. Considering the limitations of manual selection approach, a method to select candidate lines automatically is proposed, which consists of five stages to reinforce existing corridors and new corridors. Results of the two test systems illustrate that the locational marginal price difference is neither sufficient nor necessary condition for candidate lines. The uncertainty of load demand and wind power is studied both in the TEP and UC problems. In the term of TEP, a two-stage stochastic formulation of TEP is proposed. The stochastic dual dynamic programming (SDDP) approach is applied to consider the uncertainty, and the whole model is solved by Benders decomposition (BD) technique. In the term of UC, the chance-constrained two-stage programming formulation is proposed for the day-ahead UC problem. The chance-constrained stochastic programming formulation is converted into an equivalent deterministic formulation by a sequence of approximation and verification.
Degree
thesis:*- Name dc:type.qualificationname
- d_ph
- Level dc:type.qualificationlevel
- d_ph
- Grantor dc:publisher.institution
- University of Birmingham
- Year dc:date.issued
- 2016
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Wu, Zhi
Subjects
dc:subject × 1Rights
- Language dc:language.dcterms_iso639_2
- eng