Back to search

Cranfield University

Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process

Abstract

dc:description.abstract

In this thesis, the COMAC ARJ21 fuselage’s final assembly process is used as a case study. High production rate (i.e. number of aircraft assembled per year) with reasonable cost is the overall aim in this example. The output of final assembly will essentially affect the prior and subsequent processes of the overall ARJ21 production. From the collected field data, it was identified that a number of disruptions (or bottlenecks) in the assembly sequence were caused by breakdowns and maintenance of the (semi-)automatic assembly machines like portable computer numerical control (CNC) drilling machine, rivet gun and overhead crane. The focus of this thesis is therefore on the maintenance strategies (i.e. Condition-Based Maintenance (CBM)) for these equipment and how they impact the throughput of the fuselage assembly process. The fuselage assembly process is modelled and analysed by using agent-based simulation in this thesis. The agent approach allows complex process interactions of assembly, equipment and maintenance to be captured and empirically studied. In this thesis, the built network is modelled as the sequence of activities in each stage. Each stage is broken down into critical activities which are parameterized by activity lead-time and equipment used. CBM based models of uncertain degradation and imperfect maintenance are used in the simulation study. A scatter search is used to find multi-objective optimal solutions for the CBM regime, where the maintenance-related cost and production rate are the optimization objectives. In this thesis, in order to ease computation intensity caused by running multiple simulations during the optimization and to simplify a multi-objective formulation, multiple Min-Max weightings are applied to trace Pareto front. The empirical analysis reviews the trade-offs between the production rate and maintenance cost and how these objectives are influenced by the design parameters.

Degree

thesis:*
Grantor dc:publisher
Cranfield University
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Li, Jin
Advisors dc:contributor.advisor
  • Sreenuch, Tarapong
  • Tsourdos, Antonios

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • © Cranfield University 2013. All rights reserved. No part of this publication may be reproduced without the written permission of the copyright owner.
Language dc:language.iso
en

Identifiers

dc:identifier.*
Repository record dc:identifier.uri
http://dspace.lib.cranfield.ac.uk/handle/1826/8439

Chain of custody

source
Harvested from
Cranfield University
Base URL
dspace.lib.cranfield.ac.uk/server/oai/request
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Li, Jin. Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process. Cranfield University, 2013. http://dspace.lib.cranfield.ac.uk/handle/1826/8439