Georgia Institute of Technology
Comparison of module usage of project management information system and success rate of construction projects: case study
Abstract
dc:description.abstractIf construction is about delivering a built asset that is of high quality and efficiency, wouldn t most companies use all the tools and processes available at the highest organizational level possible? A major assumption is made that Prolog Manager is an effective Project Management Information System. Saying Company X will benefit from more module use with Prolog Manager system is not the same as saying they will suffer from lack of module usage. If a company has already attained success using manual systems it successes may continue. To be as successful as possible, maximum utilization of all modules of Prolog Manager at the unique project type organizational level is necessary, and correlations can be made between higher module usage and greater project successes with this type of company size and structure.
Degree
thesis:*- Department dc:contributor.department
- Building Construction
- Grantor dc:publisher
- Georgia Institute of Technology
- Year dc:date.issued
- 2009
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sweet, Coretta A.
- Advisor dc:contributor.advisor
-
- Thomas, Linda
- Committee members dc:contributor.committeemember
-
- Castro-Lacouture, Daniel
- Roper, Kathy O.
- Smith, Ron L.
Subjects
dc:subject × 5Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1853/28204