Georgia Institute of Technology
Changes in quality management approaches for design-build highway projects
Abstract
dc:description.abstractThe purpose of this study is to determine changes in quality management approaches of design-build (DB) highway projects compared to those in design-bid-build (DBB) projects. Identifying the existing challenges in the quality management procedures in DB environment requires conducting a content analysis. This involved reviewing regulations, FHWA policy documents, quality manuals, and state DOT solicitation documents. To obtain a deeper understanding of the state of the practice in state DOTs and to identify best practices in handling the identified challenges, this study conducted structured interviews of DOT personnel and industry experts. The results indicate that responsibility for quality assurance is being transferred to design-build teams. The findings of this study show six areas of changes in DB highway projects: (1) acceptance approaches; (2) selection criteria; (3) independent assurance procedures; (4) non-conformance reports; (5) cost mechanisms; and (6) pay factor adjustment.
Degree
thesis:*- Level thesis:degree_level
- Masters
- Department dc:contributor.department
- Building Construction
- Grantor dc:publisher
- Georgia Institute of Technology
- Year dc:date.issued
- 2018
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lee, Jung Hyun
- Advisor dc:contributor.advisor
-
- Ashuri, Baabak
- Committee members dc:contributor.committeemember
-
- Yang, Eunhwa
- El Asmar, Mounir
Subjects
dc:subject × 4Rights
- Language dc:language.iso
- en_US
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1853/59960