University of Patras
ΒΕΛΤΙΣΤΕΣ ΚΑΙ ΥΠΟΒΕΛΤΙΣΤΕΣ ΛΥΣΕΙΣ ΣΕ ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΣΥΣΤΗΜΑΤΩΝ ΠΑΡΑΓΩΓΗΣ ΤΥΠΟΥ JOB-SHOP
Abstract
dc:descriptionPROBLEMS RELATED TO SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS ARE CONSIDERED IN THIS DISSERTATION. THREE BASIC APPROACHES ARE USED: ANALYSIS VIA MATHEMATICAL PROGRAMMING, APPLICATION OF FUZZY SETS THEORY AND INTEGRATION OF DECISION SUPPORT SYSTEMS. THE PROBLEM OF OPTIMAL DUE DATE DETERMINATION AND SEQUENCING OF N JOBS ON A SINGLE MACHINE AND THE PROBLEM OF LOT SIZING INA MULTI-PRODUCT SINGLE-MACHINE PRODUCTION SYSTEM ARE SOLVED BY MEANS OF THEFIRST AND THE SECOND APPROACH, RESPECTIVELY, WHILE BY MEANS OF THE LAST APPROACH A DECISION SUPPORT SYSTEM FOR SCHEDULING AND CONTROL OF A REAL PRODUCTION SYSTEM (TEXTILE INDUSTRY) HAS BEEN DEVELOPED.
Degree
thesis:*- Grantor dc:publisher
- University of Patras
- Year dc:date
- 1993
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Καρακαπιλίδης, Νίκος
- Karacapilidis, Nikos
Subjects
dc:subject × 14- Ασαφή σύνολα
- ΚΑΘΟΡΙΣΜΟΣ ΗΜΕΡΟΜΗΝΙΩΝ ΠΑΡΑΔΟΣΗΣ
- ΠΑΡΑΓΩΓΙΚΑ ΣΥΣΤΗΜΑΤΑ ΜΕ ΜΕΤΑΒΛΗΤΕΣ ΡΟΕΣ
- Προγραμματισμός παραγωγής
- Συστήματα υποστήριξης αποφάσεων
- Decision support systems
- DUE DATE DETERMINATION
- Furry sets
- JOB-SHOP
- Scheduling
- Επιστήμες Μηχανικού και Τεχνολογία
- Επιστήμη Μηχανολόγου Μηχανικού
- Engineering and Technology
- Mechanical Engineering
Rights
- Language dc:language
- gre
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/2551