National Technical University of Athens (NTUA)
TIME - LOCATION DIAGRAM SCHEDULING MODEL FOR LINEAR CONSTRUCTION PROJECTS
Abstract
dc:descriptionTHIS RESEARCH DEALS WITH THE PLANING, SCHEDULING AND CONTROLLING ALL KINDS OF LINEAR CONSTRUCTION PROJECTS. THESE ARE PROJECTS CHARACTERIZED BY; CONTINUES ACTIVITIES HAVE DIRECT CONNECTIONS OF DISTANCE AND TIME, AND PROJECTS WHICH HAVE LINEAR DISTANCES, START FROM ONE POINT DISTANCE, AND PROCEED UNTIL THE OTHER END DISTANCE OR PROJECT FINISH POINT. THESE LINEAR PROJECTS INCLUDE THE FOLLOWING: - HIGHWAY PROJECTS, TUNNEL PROJECTS, LONG BRIDGES PROJECTS, PIPELINE PROJECTS, AND RAILROAD CONSTRUCTION PROJECTS. THE RESEARCH INVESTIGATED SEVERAL ISSUES RELATED TO THE LINEAR CONSTRUCTION PROJECTS. IT POINTED OUT SOME FACTORS THAT AFFECT LINEAR CONSTRUCTION PROJECTS, WHILE IMPLEMENTING THE "CONVENTIONAL" METHODS. SOME OF THESE FACTORS ARE AS FOLLOWS: A.- THE EFFECT (INTERACTION) OF THE STATIONARY ACTIVITIES ON THE LINEAR ACTIVITIES. B.- THE LEAD OR THE LAG TIME SHOULD BE CONSIDERED DUE TO TECHNICAL REQUIREMENTS, RATHER THAN FRAGMENTATION REQUIREMENT TO GUARANTEE THE CONTINUITY OF THE ACTIVITIES. THIS WILL RESULT IN AN UNREASONABLE EXPANSION OF THE DURATION OF THE PROJECT. C.- THE ACTIVITY FRAGMENTATION REQUIREMENTS IN ORDER TO PLAN, AND TO SCHEDULE THE LINEAR CONSTRUCTION PROJECTS, WHERE IT DIVIDES THE PROJECT INTO STAGES OR PARTS, EACH STAGE BEING CONSIDERED AS A NEW ACTIVITY, WITH OCCASIONAL DIFFERENT PRODUCTION RATE IN THE ACTIVITY STAGES. THIS MAY RESULT IN DIFFERENT PRODUCTION RATES FOR SIMILAR ACTIVITIES AT DIFFERENT STAGES (ABSTRACT TRUNCATED)
Degree
thesis:*- Grantor dc:publisher
- National Technical University of Athens (NTUA)
- Year dc:date
- 1996
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- El Okaili, Ziad
Subjects
dc:subject × 10Rights
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/8879