University of Guelph
Development of Algorithm for Scheduling an Assembly Shop: An Industrial Case Study
Abstract
dc:description.abstractThis research presents a Mixed-Integer Linear Programming (MILP) model for project scheduling with parallel machines, incorporating sequence-dependent setup times and dual resource constraints. The model aims to minimize delays and optimize resource utilization. Due to computational limitations, a Genetic Algorithm (GA)-based framework was developed, which outperformed the Branch-and-Cut algorithm in terms of efficiency and solution quality. The GA achieved a near-optimal makespan of 1785 minutes, while the BC algorithm required 69 hours to converge to a suboptimal solution. This research contributes to the advancement of heuristic optimization techniques for complex scheduling environments, offering insights for industries seeking efficient solutions for production planning and resource management.
Degree
thesis:*- Name thesis:degree_name
- Master of Applied Science
- Department thesis:degree_department
- School of Engineering
- Grantor dc:publisher
- University of Guelph
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sanchi, Sanchi
- Advisor dc:contributor.advisor
-
- Defersha, Fantahun M.
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- Attribution 4.0 International
- Licence dc:rights.uri
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10214/29034