Iowa State University
Deterministic look-ahead horizons in simulation-based real-time scheduling of an FMS
Abstract
dc:description.abstractThe emergence of flexible manufacturing systems (FMS) has helped to solve some production problems in the real world. But, there are many areas where the efficiency of an FMS can be improved. Precise scheduling is one of those areas. Real-time simulation scheduling has caught many researchers' interest since it was first introduced. Simulation horizons play an important role because of their impact on the statistical output obtained during a simulation run. The aim of this study was to examine the impact on decision making resulting from the choice of different simulation horizons. An experiment is designed for this purpose. A statistical method, one-tailed tests of significance of binomial proportion by means of the normal approximation with a correction for continuity, was employed for analyzing these data. Results indicated a low success rate in both experiments. This indicated that the decision generated by the simulation mechanism tends to be different as different simulation horizons are used. Therefore, the length of simulation horizon will affect the decision generated by the real-time scheduling mechanism and therefore the overall performance of the system.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Industrial Engineering
- Department thesis:degree_department
- Department of Industrial and Manufacturing Systems Engineering
- Year dc:date.issued
- 1997
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lai, Yi-Chiuan
- Advisor dc:contributor.advisor
-
- Gemmill, Douglas D.
Rights
- Language dc:language.iso
- en