Abstract
dc:description.abstractScheduling problems have been studied for many years for optimizing resource allocation as scheduling plays a critical role in many manufacturing and service industries. During last two decades, two-agent scheduling problems have been used in many systems, such as railroad allocation system, aircraft landing system and so on. This thesis considers various two-agent scheduling problems with a single machine, which is responsible for processing jobs from two agents. The research of single machine with two-agent scheduling models can be classified into two main categories: minimality model and feasibility model. The feasibility model based two-agent scheduling problems are studied in this thesis. In a feasibility model, the scheduling problem is objective to minimize the objective function of one agent while keeping the objective function of the other agent within a pre-specified level. In the present thesis, mathematical models, heuristics, and Ant Colony Optimization based meta-heuristics are proposed for solving the problems studied in this thesis. Furthermore, this thesis also provides a detailed and systemic survey (literature review) of the two-agent scheduling problem literature on models with a given due date. In the chapter of survey of two-agent scheduling problems with due date, the computational complexity and proposed algorithms for the due-date-related two-agent scheduling problems are list. The two-agent scheduling problems studied and proposed algorithms in this thesis are extremely useful for improving the productivity and efficiency of the manufacturing environment in a supply chain system.
Degree
thesis:*- Level thesis:degree_level
- Master of Science (M.Sc.)
- Discipline thesis:degree_discipline
- Management
- Grantor dc:publisher
- Lecture Notes in Management Science
- Year dc:date.issued
- 2016
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Li, Hongwei
- Advisor dc:contributor.supervisor
-
- Gajpal, Yuvraj (Supply Chain Management) Bector, C.R. (Supply Chain Management)
- Committee members dc:contributor.committeemember
-
- Appadoo, Srimantoorao (Supply Chain Management)
- Thulasiraman, Parimala (Computer Science)
Subjects
dc:subject × 5Rights
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Dc Identifier Citation
- Gajpal, Y., & Li, H. (2016). Single machine scheduling with two agents for total completion time objectives☆. Lecture Notes in Management Science, 8, 107.