Back to search

Nanyang Technological University

A study of semiconductor back-end manufacturing : special focus on scheduling techniques

Abstract

dc:description.abstract

The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.

Degree

thesis:*
College dc:contributor.school
School of Mechanical and Aerospace Engineering
Year dc:date.issued
2001

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Ong, Choon Keong
  • Teo, Chee Chong
  • Yeo, Lip Pin
Advisor dc:contributor.supervisor
  • Appa Iyer Sivakumar

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/60653

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Ong, Choon Keong; Teo, Chee Chong; Yeo, Lip Pin. A study of semiconductor back-end manufacturing : special focus on scheduling techniques. 2001. https://hdl.handle.net/10356/60653