Abstract
dc:description.abstract<p>The wastewater generated from installation factories contains high suspended solids ( SS ) and oil. Effective removal of oil and clay particles in washrack wastewater can be achieved by using organic polymer TFL-398 alone or in conjunction with alum. The dissolved/emulsified oil concentration and suspended solids are used to represent the degree of oil demulsification and clay particles destabilization, respectively.</p><p>To improve the efficiency of oil demulsification and reduce the chemical consumption, pretreatment of the influent wastewater is essentially necessary. pH adjustment to 11-12 generally reduces chemical requirement. Total oil concentration was reduced significantly at pH = 11.7 without any chemical addition. At this pH value, the petroleum hydrocarbons are converted to hydrophilic compounds which can no longer be extracted with organic solvents.</p><p>Flow recycle by mixing treated wastewater and raw wastewater also reduces chemical consumption. By utilizing TFL-398 alone at pH = 11.7, and flow recycle ratio of 1.5 or greater, the polymer dose of 200 mg/l can remove 95% of oil and 99.5% of clay particles. The polymer demand can be reduced to as low as 25 mg/1 in conjuction with alum dosage of 1,000 mg/l at pH = 7.0.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Environmental Engineering - (M.S.)
- Discipline thesis:degree_discipline
- Civil and Environmental Engineering
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Tai, Fong-Jung
- Contributors dc:contributor
-
- Yeun C. Wu
- Paul N. Cheremisinoff
Subjects
dc:subject × 4Identifiers
dc:identifier.*- Repository record dc:identifier
- https://digitalcommons.njit.edu/theses/2963