Determination of project duration for resource constrained projects without using resource scheduling procedure
Abstract
dc:description.abstract<p>The problem addressed in this thesis is that of determining the practicability of equating measures of network and resource characteristics to the early finish date of a project which is constrained by resources. The output of standard critical path calculations along with information on resource profiles that are easy to calculate can be of use in estimating resource constrained project duration.</p><p>Twenty two different equations ( developed by Hall) were used to find the estimated project finish dates. These results were compared to the schedule resulting from the application of the heuristic rule of minimum activity float. It is shown that the calculations may be used as a substitute to resource leveling procedure.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Civil Engineering - (M.S.)
- Discipline thesis:degree_discipline
- Civil and Environmental Engineering
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Karmakar, Rabindra Nath
- Contributors dc:contributor
-
- Edward G. Dauenheimer
- Walter Konon
- John R. Schuring
Subjects
dc:subject × 3Identifiers
dc:identifier.*- Repository record dc:identifier
- https://digitalcommons.njit.edu/theses/3112