Purdue University
Analysis and application of earned value management to the Naval Construction Force
Abstract
dc:description.abstractThis paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Engineering
- Grantor dc:publisher
- Purdue University
- Year dc:date.issued
- 2001
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Hayes, Richard D.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Distribution Statement A. Approved for public release: Distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/10949