Back to search

University of Maryland, College Park

Planning and implementation of non-potable water reuse projects at U.S. Naval installations

Abstract

dc:description.abstract

With the passage of Executive Orders 12902 and 13123, the U.S. Navy has been forced to develop water conservation programs and evaluate how water is used at each of its installations. The central goal of these orders is to reduce potable water consumption at federal facilities. Water reuse and recycling has been listed as a best management practice for achieving this goal. However, only a handful of Navy facilities have implemented water reuse projects to date. One of the reasons for this phenomenon is the lack of comprehensive guidance for planning and executing water reuse projects. Consequently, very few Navy facility and energy managers have experience or knowledge regarding water reuse applications. This paper addresses the key factors that must be considered when attempting to execute water reuse projects on Navy installations. Specifically, the following areas are examined: (1) scope and requirements of the U.S. Navy Water Conservation Program, (2) Federal, state, and local regulations, guidance, and other legal issues relating to water reuse, (3) treatment processes used to remove contaminants in order to meet process or regulatory requirements, (4) potential water reuse applications, (5) water storage, (6) risk management, (7) economic considerations, and (8) the project implementation process. Finally, a case study of the U.S. Naval Construction Battalion Center, Gulfport, MS that evaluates various options for water reuse is included at the end of the paper. This paper is intended to establish baseline guidance for planning and implementing water reuse projects at Navy installations. However, site-specific requirements must be considered when planning individual projects. Each base and community will view water reuse differently. The availability of water, public perceptions, intended applications, funding availability, and a host of other issues will determine a water reuse project's success. It is up to facility managers to balance technical requirements, benefits, risks, and local concerns in the planning process.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Civil Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Civil Engineering
Grantor dc:publisher
University of Maryland, College Park
Year dc:date.issued
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Malkin, Joshua Benjamin
Advisor dc:contributor.advisor
  • Torrents, Alba

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Distribution Statement A. Approved for public release: Distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/11037

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Malkin, Joshua Benjamin. Planning and implementation of non-potable water reuse projects at U.S. Naval installations. Masters thesis, University of Maryland, College Park, 2003. https://hdl.handle.net/10945/11037