Back to search

Monterey, California. Naval Postgraduate School

OMB A-76 : full costing and its impact at installation level within the U.S. Army.

Abstract

dc:description.abstract

This thesis evaluates the methods for accumulating costs attributable to the overhead pools of an Army in-house estimate for Government performance of Commercial or Industrial Type Activities (CITA) . The full costing requirement of Office of Management and Budget (OMB A-76) of March 1979 is investigated vis-a-vis its impact at the installation level within the Army. Initial discussion addresses the evolution of the comparative cost analysis as a basis for in-house operation of a CITA function and explores the guidance provided by OMB, the Department of Defense, and the Department of the Army (DA). The concept of "full cost" was reviewed as used by private industry. A case was developed around Government contractors/ and nonprofit organizations. A major DA installation was used to illustrate the cost accumulation process and sources of cost data available to a typical DA installation. It was concluded that collection of relevant cost data to support CITA cost analysis was unnecessarily tedious and time consuming; and two steps were recommended to improve this process.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Department dc:contributor.department
Administrative Sciences
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1980

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hintze, Grant G.
Advisor dc:contributor.advisor
  • Bobulinski, R.A.
Committee member dc:contributor.committeemember
  • Liao, Shu S.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/17649

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Hintze, Grant G.. OMB A-76 : full costing and its impact at installation level within the U.S. Army.. Masters thesis, Monterey, California. Naval Postgraduate School, 1980. https://hdl.handle.net/10945/17649