A statistical analysis of the effectiveness of program initial conditions as predictors of weapon system acquisition program success
Abstract
dc:description.abstractThis thesis examines the relationship between weapon system acquisition program's initial conditions (project size, technical risk and program length) and program outcomes in the areas of cost, performance and schedule. The study employs a nonparametric correlation procedure and Mann-Whitney U Tests as the principal analytic tools of the examination process. The results of the analysis indicate that a definite relationship between cost/schedule growth and program size exists. In a significant number of cases, large programs incurred greater absolute cost growth with less schedule slippage than did programs of smaller size. The variance in project technical performance is largely unexplained by the methodology, although there are indications that it is related inversely to program length.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Applied Science
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Applied Science
- Department dc:contributor.department
- Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1976
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Henry, Douglas Davies
- Advisor dc:contributor.advisor
-
- Eoyang, Carson K.
- Committee member dc:contributor.committeemember
-
- Sovereign, Michael G.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/17953