Monterey, California. Naval Postgraduate School
An analysis of maintenance factors on selected U.S. Navy ships.
Abstract
dc:description.abstractThis study examined certain reported maintenance factors to better understand how they influence the accomplishment of shipboard maintenance in cruisers and guided missile destroyers. The data was generated by the Equipment Maintenance and Related Maintenance (EMRM) Project, Pacific, and other reports normally submitted by the ships. Though part of the data was broken down to work center level, this research did not go below the ship level. This study showed 1) how the accomplishment of preventive maintenance varied as additional maintenance requirements were scheduled; 2) how the accomplishment of preventive versus corrective maintenance changed as funds for repair parts were increased; and 3) how the ships' employment schedules affected their accomplishment of shipboard maintenance Additionally, an hypothesis test was used to show that there was a difference in the maintenance activity of the EMRM test group ships compared to the EMRM control group ships.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1977
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Grigsby, Jerry Carson
- Advisor dc:contributor.advisor
-
- Sovereign, M.G.
- Committee member dc:contributor.committeemember
-
- Hartman, James K.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/18011