Abstract
dc:description.abstractThe build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Systems Engineering Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Systems Engineering Management
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2005
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Carter, Joanna M.
- Advisors dc:contributor.advisor
-
- Marvel, Orin
- Gudas, John
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- OCLC
- 62881400