Back to search

Monterey, CA; Naval Postgraduate School

Shipbuilding integration

Abstract

dc:description.abstract

The build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Systems Engineering Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Systems Engineering Management
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Carter, Joanna M.
Advisors dc:contributor.advisor
  • Marvel, Orin
  • Gudas, John

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
OCLC
62881400

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Carter, Joanna M.. Shipbuilding integration. Masters thesis, Monterey, CA; Naval Postgraduate School, 2005. https://hdl.handle.net/10945/1841