Monterey, California. Naval Postgraduate School
Preparation costs of step two special project submissions at Navy Public Works Centers
Abstract
dc:description.abstractThis thesis compares the cost to the government of contracting out Special Project Step Two submissions versus the cost of preparing Step Two submissions with in-house government employees, Data from 80 Step Twos prepared at two Navy Public Works Centers were collected and analyzed, The results indicate conclusively that Step Two preparation by in-house employees is much less costly than contracting out Step Two preparation. In addition to the cost comparison, predictive models were developed for Step Two preparation cost, based upon certain characteristics of the Special Project for which the Step Two is being prepared. The thesis contains background information on the Naval Facilities Engineering Command, Navy Public Works Center, the Special Project Program, and the negotiated architectural and engineering contract process. Possible alternatives to the current Step Two preparation process are presented and discussed.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Department of Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1984
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Dressel, Kenneth W.
- Advisors dc:contributor.advisor
-
- Carrick, P. M.
- Talutis, W. R.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/19507