Monterey, California. Naval Postgraduate School
A two-period repair parts inventory for a Naval Air Rework Facility.
Abstract
dc:description.abstractA Ready Supply Store (RSS) containing repair parts which are anticipated to be used during the production process has been established to support the Naval Air Rework Facility (NARF) . While this supporting inventory has previously been constructed using historical demand data, a model which computes stock levels based on the next quarter's production schedule has been proposed. This thesis extends the use of projected production information in calculating RSS inventory levels from one to two periods, and compares the expected total costs from both systems under the assumption of a binomial demand distribution which is appropriate to a NARF. As a result of this comparison, the conclusion is made that the two-period model offers only very minor expected cost advantages over a single-period formulation, while also being much more difficult to utilize due to the complex calculations involved in the computation process.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Management
- College dc:contributor.school
- Naval Postgraduate School
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1982
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Hund, John J.
- Advisor dc:contributor.advisor
-
- McMasters, Alan W.
- Committee member dc:contributor.committeemember
-
- Solis, Armondo
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/20382