Monterey, California. Naval Postgraduate School
Application of Reliability Improvement Warranty (RIW) to DoD procurements.
Abstract
dc:description.abstractThe existence of a goal conflict in the buyer/seller relationship is inherent under a profit motivated system where conventional procurement techniques are used. The buyer seeks maximum performance at minimum life cycle cost and the seller seeks to maximize profit which may translate to minimizing reliability improvement costs. Experience of military and commercial procurement activities with the use of Reliability Improvement Warranties (RIW's) has led to the conclusion that the RIW may be a valuable tool in bringing buyer/ seller goals into agreement by transferring the management of costs to the seller. Background material on DoD and commercial warranty experience is used to form the framework for an evaluation criteria developed by ARINC Research Corporation to test the applicability of RIW to a particular acquisition. The limited DoD guidance which has been promulgated is recapitulated for consolidation with the ARINC criteria and recent experience.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1975
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Allen, Dennis Jean
- Advisor dc:contributor.advisor
-
- Judson, R.R.
- Committee member dc:contributor.committeemember
-
- Raike, William M.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/20760