Back to search

Naval Postgraduate School

An analysis of the cost-volume relationships within the aircraft program of the Naval Air Rework Facility, Alameda, California

Abstract

dc:description.abstract

The purpose of this research project is to examine the cost behavior of the Naval Air Rework Facility, Alameda, California, aircraft program in relation to variations in aircraft rework workloads, and to develop cost-volume relationships useable in support of pricing and workload decisions. Analysis of four years of quarterly direct and indirect cost data provided the base from which total cost-volume models were derived for the four aircraft program segments (A-6, P-3, S-3, and A-3). The results of this study indicate that significant cost-volume relationships exist not only with the direct costs but also with many associated indirect aircraft program costs. The study further suggests that other factors, such as rate and direction of volume changes and levels of personnel strengths, may have predictable affects on aircraft reworks costs.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Department dc:contributor.department
Administrative Sciences
Grantor
Naval Postgraduate School
Year dc:date.issued
1986

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ferriman, Robert L.
Advisor dc:contributor.advisor
  • Liao, Shu S.
Committee member dc:contributor.committeemember
  • Greer, Will R., Jr.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/21644

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Ferriman, Robert L.. An analysis of the cost-volume relationships within the aircraft program of the Naval Air Rework Facility, Alameda, California. Masters thesis, Naval Postgraduate School, 1986. https://hdl.handle.net/10945/21644