Back to search
Naval Postgraduate School
An analysis of government furnished material (GFM)--in new construction ships.
Abstract
dc:description.abstractThis thesis discusses the supply support process for new construction ships, the feasibility, cost and impact of maximizing the use of the Navy supply system for repair parts and equipage, and provides regression models for use in program budget formulation and execution. The discussion includes the criteria for determining contractor versus government furnished equipment and material. The report also presents the results of a test case involving the transfer of parts procurement responsibility from the contractor to the Government.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor
- Naval Postgraduate School
- Year dc:date.issued
- 1986
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Masters, Paul John
- Advisor dc:contributor.advisor
-
- Boger, Dan C.
- Committee member dc:contributor.committeemember
-
- Sullivan, Timothy J.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/21649