Back to search

Naval Postgraduate School

Analysis of construction design estimation practices at Public Works Center

Abstract

dc:description.abstract

The purpose of this study was to develop a statistically validated predictive model for construction design man-hours to aid in the decision-making process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered that the design man-hours estimation procedure is inaccurate and causes PWC to hold customer funds that could be used for other purposes. A decision-making model was developed to assist in assigning project to in-house design resources or to Architect-Engineer firms. In addition, significant cost savings are already being realized through the use of the Computer Aided Design and Drafting System, with greater savings projected when the system is fully installed.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Department dc:contributor.department
Administrative Sciences
Grantor
Naval Postgraduate School
Year dc:date.issued
1987

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • George, Stephen L.
Advisor dc:contributor.advisor
  • Fremgen, James
Committee member dc:contributor.committeemember
  • Duke, James R.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/22608

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

George, Stephen L.. Analysis of construction design estimation practices at Public Works Center. Masters thesis, Naval Postgraduate School, 1987. https://hdl.handle.net/10945/22608