Naval Postgraduate School
Analysis of construction design estimation practices at Public Works Center
Abstract
dc:description.abstractThe purpose of this study was to develop a statistically validated predictive model for construction design man-hours to aid in the decision-making process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered that the design man-hours estimation procedure is inaccurate and causes PWC to hold customer funds that could be used for other purposes. A decision-making model was developed to assist in assigning project to in-house design resources or to Architect-Engineer firms. In addition, significant cost savings are already being realized through the use of the Computer Aided Design and Drafting System, with greater savings projected when the system is fully installed.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor
- Naval Postgraduate School
- Year dc:date.issued
- 1987
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- George, Stephen L.
- Advisor dc:contributor.advisor
-
- Fremgen, James
- Committee member dc:contributor.committeemember
-
- Duke, James R.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/22608