University of Florida
An analysis of the use of Linear Scheduling Techniques in the construction industry.
Abstract
dc:description.abstractA construction scheduling technique is presented which is, in many cases, more advantageous, to both the contractor & the owner, than bar charts typically provided by contractors, particularly for projects that are linear in nature or have repetitive activities scheduled in phases (e.g. roads, piping systems, bridge spans, and high rise buildings). The technique is labeled the linear scheduling method because it is most useful in the construction industry for projects that are linear in nature. The technique maps planned or actual works along the length, or stations, of a project versus time. The basic application of this method is described. Examples of practical application are provided, including a comparative analysis based on an actual Florida Department of Transportation construction project. The technique is compared to the more prevalent bar chart technique utilized in such software applications as Primavera Project Planner
Degree
thesis:*- Name thesis:degree_name
- Masters of Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Engineering
- Grantor dc:publisher
- University of Florida
- Year dc:date.issued
- 1998
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sims, Steven L.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- OCLC
- ocn640504037