Back to search

Monterey, California. Naval Postgraduate School

The use of life cycle costing for the acquisition of non-major systems at the Naval Regional Contracting Center, Detachment, Long Beach, CA

Abstract

dc:description.abstract

The use of Life Cycle Costing (LCC) has many potential benefits for the Government. These benefits range from reduced total ownership costs to increased reliability to improved maintainability. However, prior to applying the LCC technique, an analysis should be conducted to determine its usefulness. Consequently, the purpose of this thesis is to assess the applicability of the LCC concept to the purchase of non-major systems at the Naval Regional Contracting Center (NRCC) Detachment, Long Beach. The primary method of achieving this objective was through modifying the Graham LCC Decision Model for Spare Parts so that the Model could evaluate the usefulness of LCC for the purchase of a particular non-major system. Through the use of the Modified Graham LCC Decision Model, telephone and personal interviews, and a thorough literature review, the researcher found the usefulness of Life Cycle Costing for the acquisition of non-major systems at the NRCC, Detachment to be very limited.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Department dc:contributor.department
Department of Administrative Sciences
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1992

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tucker, R. Forrest
Advisors dc:contributor.advisor
  • Matsushima, Rodney F.
  • Zirschky, Stephen

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/24089

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
related terms
citation

Tucker, R. Forrest. The use of life cycle costing for the acquisition of non-major systems at the Naval Regional Contracting Center, Detachment, Long Beach, CA. Masters thesis, Monterey, California. Naval Postgraduate School, 1992. https://hdl.handle.net/10945/24089