Back to search

Monterey, California. Naval Postgraduate School

Financial condition of Government contractors and control of production costs in the procurement of major DOD aircraft weapon systems.

Abstract

dc:description.abstract

The thesis identifies conditions associated with production cost overruns or underruns on major weapon systems. The analysis used U.S. military fighter/attack aircraft. First, relying on techniques developed in prior studies, measures of the technology embodied in aircraft and the cost of producing those aircraft were developed. Next, relationships between technology and cost were examined to create measures of "should costs", for each aircraft based on technology in the aircraft. These estimates of "should costs" were compared to actual costs to determine situations of cost overruns and underruns. Analyses of financial ratios of each aircraft's prime contractor were used to determine if financial condition could explain the cost overruns or underruns experienced during production, by using several forms of regression analysis. This yielded models relating financial ratios to cost overruns or underruns. Major findings indicate that financial condition does partially explain production cost overruns and underruns, but the relationship is small.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Department dc:contributor.department
Administrative Sciences
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1989

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hicky, John Stratton.
Advisor dc:contributor.advisor
  • Moses, O. Douglas
Committee member dc:contributor.committeemember
  • Matthews, Danny G.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/27054

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Hicky, John Stratton.. Financial condition of Government contractors and control of production costs in the procurement of major DOD aircraft weapon systems.. Masters thesis, Monterey, California. Naval Postgraduate School, 1989. https://hdl.handle.net/10945/27054