Monterey, CA; Naval Postgraduate School
Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)
Abstract
dc:description.abstractThis thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction of setup time is targeted. This thesis examines the potential benefits available to the Power Plant Facility by applying Single-Minute-Exchange-of-Die (SMED) to reduce setup times. SMED's conceptual stages are first examined and then related to the Power Plant Facility to illustrate the applicability of SMED to a repairrebuild environment. Recommendations are made to reduce setup times in two work centers.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Department of Administrative Sciences
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 1990
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Combs, Michael L.
- Advisor dc:contributor.advisor
-
- Trietsch, Dan
- Committee member dc:contributor.committeemember
-
- McMasters, Alan W.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/27731