Georgia Institute of Technology
Alternative dispute resolution for U.S. Navy construction contracts
Abstract
dc:description.abstractThis paper will examine the reasons the private construction industry has begun to use ADR to solve its litigation problems. It will then look at the formal claims process a contractor's claim must follow within the Department of Defense and NAVFACENGCOM to reach final resolution through the courts. Next the paper will examine the experience NAVFACENGCOM and the Army Corps of Engineers have had with ADR. In addition it will examine some of the reasons the Army Corps of Engineers has learned as to why the private construction industry has been reticent to join in the ADR process. Finally it will make recommendations as to how the NAVY can improve its ADR program and encourage its construction contractors to join the process.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Civil Engineering
- Level thesis:degree_level
- Masters
- Grantor dc:publisher
- Georgia Institute of Technology
- Year dc:date.issued
- 1990
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Rakel, Jerome Paul
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- OCLC
- ocm84213335