Monterey, California. Naval Postgraduate School
An analysis of inadequate subcontract evaluation and subcontractor defective pricing within the Department of Defense
Abstract
dc:description.abstractThis study was conducted to examine problems identified by GAO during the 1985-1992 time frame in the area of subcontract management within DoD, specifically, inadequate subcontract evaluation and subcontractor defective pricing. Questionnaires were sent to DCAA auditors nationwide and DoD prime contractors and subcontractors in California. The study concludes that the problems of subcontract estimating system deficiencies and subcontractor defective pricing continue to be major discrepancies within DoD.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Management
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1995
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Beaubien, Roger Taylor
- Advisors dc:contributor.advisor
-
- Desbrow, Sandra M.
- Eaton, Donald R.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/31402