Monterey, California: Naval Postgraduate School.
Operation and Funding of the Regional Wartime Construction Manager
Abstract
dc:description.abstractThis thesis prepares a training exercise scenario for the Navy's Regional Wartime Construction Manager - Mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise cf the management of resources, a Resource Cost Model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; Operations and Maintenance (0 & M) and Military Construction (MILCON). Next, the policies of Titles 10 and 41 of the U.S. Code, which permit the use of unobligated MILCON funds and deficiency spending, are discussed. Finally, the direct labor and overhead costs of the RWCM1 staff, the deputy, and the area managers are estimated. The total cost is estimated to range from $12.5 to $15.2 million per year.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor dc:publisher
- Monterey, California: Naval Postgraduate School.
- Year dc:date.issued
- 1990
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Cook, Paul Stephen
- Advisor dc:contributor.advisor
-
- Fremgen, James M.
- Committee member dc:contributor.committeemember
-
- Suchan, James E.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Dc Identifier Citation
- AD-A241 665