Back to search

Monterey, CA; Naval Postgraduate School

Meeting the challenge of installing CANES during new ship construction on LPD 28

Abstract

dc:description.abstract

The budget to build ships and modernize and sustain the C4I systems installed is limited. Lead times for contracting are long, while technology changes rapidly after contract award. The shipboard C4I network examined in this thesis typifies this dichotomy. The challenge is to provide the latest shipboard network that meets the C4I capability needs of the warfighter at ship delivery, while at the same time supporting the shipbuilder’s need for Government Furnished Information (GFI) and Government Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 during New Ship Construction. Recommendations include implementation of the Design Budget Approach during New Ship Construction, use of the Systems Engineering (SE) V Method during C4I network system development to verify and validate warfighter requirements can be net, and a commitment to the GFE Program of Record (POR) C4I network solutions.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Systems Engineering Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Systems Engineering Management
Department dc:contributor.department
Systems Engineering (SE)
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2015

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Philpott, Alan D.
Advisor dc:contributor.advisor
  • Olwell, David H.
Committee member dc:contributor.committeemember
  • Madachy, Ray

Rights

dc:rights
Statement dc:rights
  • Copyright is reserved by the copyright owner.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/45241

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Philpott, Alan D.. Meeting the challenge of installing CANES during new ship construction on LPD 28. Masters thesis, Monterey, CA; Naval Postgraduate School, 2015. https://hdl.handle.net/10945/45241