DEFICIENCIES IN THE REQUIREMENT GENERATION PHASE THAT DELAY THE LEAD TIME OF ARMY CONTRACT ACTIONS

Abstract

dc:description.abstract

The purpose of this mixed-methodology study is to identify opportunities to reduce administrative requirements lead time for contracting actions at Army Contracting Command (ACC) organizations, at CONUS installation level, for future implementation across ACC units. An analysis of FY19–21 reveals issues in the training resources available to operational contract support personnel that degrade critical contract elements, increasing the procurement action lead time for service requirements. The findings show service contracts have a longer requirements generation phase than supply contracts. The longer requirements generation phase is associated with the level of complexity and required documentation for each contract action. As complexity decreases, requirements lead time also decreases. The research further reveals an inverse relationship between the use of standardized resource tools and requirements lead time; the lead time decreased as utilization rates increased. The results of the research indicate that policy implementation and consolidation of standardized resource tools would have a reductive effect on lead time for contract actions within the ACC. Additionally, the research recommends modifying the training curriculum to focus on the requirements generation phase. Furthermore, the research recommends changing table of organization and equipment (TOE) positions to require the additional skill identifier 3C for all S4s/G4s and supply sergeants at every echelon.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Systems Engineering Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Systems Engineering Management
Department dc:contributor.department
Systems Engineering (SE)
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2021

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Baran, Ena G.
  • Bookwalter, Randy W.
  • Kemp, Larry V.
  • Villegas, Nicolas
  • Wolfe, Paul L., III
Advisors dc:contributor.advisor
  • Hatch, William D., II
  • Poree, Kelley
Committee member dc:contributor.committeemember
  • Hernandez, Alejandro S.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release. Distribution is unlimited.

Identifiers

dc:identifier.*
Dc Identifier Programcode
522, Systems Engineering Management -- System Acquisition
Thesis Thesis Identifier
37073

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Baran, Ena G.; Bookwalter, Randy W.; Kemp, Larry V.; Villegas, Nicolas; Wolfe, Paul L., III. DEFICIENCIES IN THE REQUIREMENT GENERATION PHASE THAT DELAY THE LEAD TIME OF ARMY CONTRACT ACTIONS. Masters thesis, Monterey, CA; Naval Postgraduate School, 2021. https://hdl.handle.net/10945/68797