Back to search

Monterey, CA; Naval Postgraduate School

A PROBABILISTIC APPROACH TO JOB-SHOP MANUFACTURING ESTIMATION AND PERFORMANCE FORECASTING

Abstract

dc:description.abstract

In defense job-shop manufacturing, cost and schedule estimates along with performance to those estimates have a heavy impact on overall project budget and schedule for pre-milestone B activities. Variations at this stage of the project tend to directly influence the availability of the system under development, which results in propagating delays through the rest of the Technology Maturation & Risk Reduction phase. Project stakeholders have a need to understand impacts from uncertainty along with anticipated variances to cost and schedule continuously throughout the manufacturing process. Extending earned value management techniques with probabilistic modeling may be able to provide meaningful insight into manufacturing estimates and performance without requiring project stakeholders to have detailed familiarity with the manufacturing process. This thesis explores if probabilistic estimation methods are sufficient to predict actual performance and compare existing methods of project estimation and performance reporting with combined probabilistic forecasting. This work demonstrates that additional insight can be attained with probabilistic forecasting that is useful to program managers during job-shop manufacturing project execution and can serve as an additional leading indicator of cost and schedule variance.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Systems Engineering Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Systems Engineering Management
Department dc:contributor.department
Systems Engineering (SE)
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2023

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kline, Eric V.
Advisor dc:contributor.advisor
  • Anderson, Timothy P.
Committee member dc:contributor.committeemember
  • Van Bossuyt, Douglas L.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release. Distribution is unlimited.

Identifiers

dc:identifier.*
Dc Identifier Programcode
721, Systems Engineering Management-PD21 (DL)
Thesis Thesis Identifier
38915

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Kline, Eric V.. A PROBABILISTIC APPROACH TO JOB-SHOP MANUFACTURING ESTIMATION AND PERFORMANCE FORECASTING. Masters thesis, Monterey, CA; Naval Postgraduate School, 2023. https://hdl.handle.net/10945/72363