Back to search

Monterey, CA; Naval Postgraduate School

Life Cycle Cost Estimate of LSD(X)

Abstract

dc:description.abstract

This thesis develops a model that provides a credible and reliable rough order magnitude (ROM) Life Cycle Cost Estimate (LCCE) for a newly constructed U. S. Navy Dock Landing Ship, LSD(X), over the various phases of design, procurement, and operations and support costs. The Systems Engineering Analysis (SEA) Curriculum at the Naval Postgraduate School (NPS) will use this estimate to help establish the costs of the proposed alternatives for LSD(X). This study also includes a cost benefit analysis through the comparison of LSD(X) to an alternative variant LSD(XB). The comparison examines how the baseline ROM LCCE of LSD(X) is affected by changes in technical parameters such as beam, number of LCACs, troop size, crew size and cargo capacity. Ultimately, this thesis provides a useful tool to aid decision makers in selecting the most cost effective alternative for the LSD(X) fleet for the expected 30 year operational period.

Degree

thesis:*
Name thesis:degree_name
Master of Science In Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Department dc:contributor.department
Operations Research (OR)
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hills, Allison
Advisor dc:contributor.advisor
  • Nussbaum, Daniel A.
Committee member dc:contributor.committeemember
  • Mislick, Gregory

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/7358

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Hills, Allison. Life Cycle Cost Estimate of LSD(X). Masters thesis, Monterey, CA; Naval Postgraduate School, 2012. https://hdl.handle.net/10945/7358