Abstract
dc:description.abstractThis research develops the rocket inspection scheduling optimization model (RISOM), a new approach to scheduling rocket motors for low-temperature conditioning and x-ray inspection at Naval Surface Warfare Center Indian Head Division. RISOM seeks to maximize the value of motors that complete inspection, while also minimizing their lateness. RISOM is tested using simulated data based on realistic demand projections. Results show that current facility and labor capacity can meet 90% of the simulated demand, but the range of lateness is undesirable. Increasing the x-ray facilities by 50% allows all motors to be scheduled and reduces lateness to a few days. Adding one eight-hour shift reduces lateness to within a month. Combining other labor and facility additions, we reduce lateness to about one day for 90% of the motors.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Systems Engineering Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Systems Engineering Management
- Department dc:contributor.department
- Systems Engineering (SE)
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2025
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lancaster, Ezekiel B.
- Advisor dc:contributor.advisor
-
- Salmeron-Medrano, Javier
- Committee member dc:contributor.committeemember
-
- Emmons, Nelson L.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Distribution Statement A. Approved for public release: Distribution is unlimited.
Identifiers
dc:identifier.*- Dc Identifier Programcode
- 721, Systems Engineering Management-PD21 (DL)
- Thesis Thesis Identifier
- 40977