Back to search

Monterey, CA; Naval Postgraduate School

ESTIMATING THE COST OF INEFFICIENT DECISION METRICS: SIMPLIFYING THE SHORE INFRASTRUCTURE PRIORITIZATION PROCESS

Abstract

dc:description.abstract

Every year, the U.S. Navy (USN) must decide which infrastructure projects to fund given limited budgets yet billions of dollars in requirements. For two decades, the decision lens (DL) metric has been used for this prioritization by comparing infrastructure projects on key factors, such as mission alignment and operational cost. Despite its role in shaping investment decisions, little analysis has been conducted on the DL metric or its impact on the Shore Cross Functional Team (SCFT) process, which costs millions of dollars and uses thousands of person-hours to adjudicate DL scores every year. This work uses stochastic simulation to estimate the current costs to produce DL scores, whether a simplified DL metric would reflect USN priorities, and if there are any savings in the SCFT process with a simplified metric. First, we develop a stochastic model to estimate time and costs (i.e., salaries by pay grade) required for the SCFT, which shows the SCFT can cost an average of $1.8M and 35,000 person-hours per year given uncertainty in number of projects and people. Then, we analyze historical DL scores to determine which DL factors are necessary to align scores to USN priorities. Results show that some factors are redundant—i.e., the DL metric is >90% rank correlated to historical priorities without considering them at all. Accordingly, we estimate the cost and time savings incurred by removing these redundant factors approach 57% annually, or up to $1.0M and 20,000 person-hours.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Department dc:contributor.department
Operations Research (OR)
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Allison, Stuart G.
Advisors dc:contributor.advisor
  • Alderson, David L., Jr.
  • Eisenberg, Daniel
Committee member dc:contributor.committeemember
  • Atkinson, Michael P.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Distribution Statement A. Approved for public release: Distribution is unlimited.

Identifiers

dc:identifier.*
Dc Identifier Programcode
360, Operations Analysis
Thesis Thesis Identifier
41840

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Allison, Stuart G.. ESTIMATING THE COST OF INEFFICIENT DECISION METRICS: SIMPLIFYING THE SHORE INFRASTRUCTURE PRIORITIZATION PROCESS. Masters thesis, Monterey, CA; Naval Postgraduate School, 2026. https://hdl.handle.net/10945/75646