University of Texas at Austin
An evaluation of the time constrained and resource constrained scheduling features of commercially available project management software
Abstract
dc:description.abstractThe major suppliers of commercially available project management software were identified. These suppliers were surveyed to ascertain the nature of the time constrained and resource constrained scheduling effectiveness provided by the software. The survey also identifies the major features of the software as well as the minimum and recommended computer hardware requirements for the software. The software suppliers were all provided with the same sample network for time constrained and resource constrained scheduling. The results of the scheduling calculations are analyzed to evaluate the effectiveness of the software's procedures. No specific recommendations or opinions are given concerning any of the individual software products or suppliers.
Degree
thesis:*- Name thesis:degree_name
- Master in Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Engineering
- Grantor dc:publisher
- University of Texas at Austin
- Year dc:date.issued
- 1996
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Norwood, John Sheppard
- Advisor dc:contributor.advisor
-
- Popescu, Calin M.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- OCLC
- ocn640478875