University of Maryland, College Park
Performance bonds under the Federal Acquisition Streamling Act (1994)
Abstract
dc:description.abstractWith the passage of the Federal Acquisition Streamlining Act (FASA) of 1994, the U.S. Federal Government set in motion a process which is intended to reform the federal acquisition process with the aim of achieving greater efficiency and value. Although numerous initiatives have been adopted in pursuit of this goal, one area which has been neglected is performance bonds. In keeping with the Total Quality Management (TQM) objective of reaping benefits from the 'low hanging fruit' first, this paper examines the potential savings available as a result of relatively minor changes to the way requirements for performance bonds on Navy construction contracts are determined. The result is savings which appear to be 'hanging low' indeed. By shifting to a risk-based system of requiring performance bonds only on those contract with an appreciable default risk, savings of 0.5% to 1.0% of the gross cost of construction appear to be available with very little loss potential.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Civil Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Civil Engineering
- Grantor dc:publisher
- University of Maryland, College Park
- Year dc:date.issued
- 1997
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Tave, Gary A.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/8815